A 1980s pink bathroom, now a walk-in shower
Pink mosaic tile and a cramped shower became a walk-in shower with large-format porcelain, a floating double vanity and matte black fixtures.
- Location
- Hollywood
- Service
- Bathroom remodeling
- Timeline
- 2.5 weeks
- Budget
- $$


The problem
The original pink tile had loose grout and mildew, the shower pan was leaking into the wall, and the single vanity left no counter space for two people.
What we did
- 1Demolished down to the studs and repaired the water-damaged framing
- 2New shower pan, full waterproofing membrane and a recessed niche
- 3Large-format porcelain on the walls and a frameless glass panel
- 4Floating double vanity with quartz top and new lighting
The result
A bright, easy-to-clean bathroom with room for two, and a leak that had been there for years finally fixed.